Carbon Reduction Plan
Caremonitor Pty Ltd
Registration number: 50616417728
Head office: Level 4, 141 Walker Street, North Sydney, NSW, 2060, Australia
Reporting Year: FY2025
Commitment to Achieving Net Zero
CareMonitor is committed to achieving Net Zero greenhouse gas emissions by 2050, in alignment with UK Government policy and Procurement Policy Note (PPN) 06/21.
We are focused on achieving absolute emissions reductions across Scope 1, 2 and 3, with offsetting used only for residual emissions that cannot be eliminated.
Baseline Emissions Footprint (FY2023)
| Scope | Emissions Source | Emissions (tCO₂e) |
|---|---|---|
| Scope 1 | Gas use and company vehicles | 8 |
| Scope 2 | Purchased electricity | 22 |
| Scope 3 | Business travel, commuting, cloud hosting, purchased services | 210 |
| Total | 240 tCO₂e |
Key Assumptions
Cloud infrastructure is a major contributor within Scope 3
Limited direct emissions due to digital-first operating model
Hybrid workforce reduces commuting footprint
Current Emissions Reporting (FY2025)
| Scope | Emissions (tCO₂e) |
|---|---|
| Scope 1 | 6 |
| Scope 2 | 14 |
| Scope 3 | 180 |
| Total | 200 |
Reduction Achieved Since Baseline
17% total emissions reduction
36% reduction in Scope 1 and 2 emissions
Scope 3 Breakdown (FY2025)
| Category | Emissions (tCO₂e) |
|---|---|
| Cloud hosting and data services | 90 |
| Purchased goods and services | 40 |
| Business travel | 20 |
| Employee commuting | 18 |
| Waste and other | 12 |
Emissions Reduction Targets
CareMonitor has defined the following science-aligned targets:
By 2030:
Reduce Scope 1 and 2 emissions by 60% (from FY2023 baseline)By 2035:
Reduce total emissions (including Scope 3) by 50%By 2040:
Reduce total emissions by 75%By 2050:
Achieve Net Zero emissions
Carbon Reduction Initiatives
Measures Already Implemented
Hybrid and remote-first workforce model
Migration to energy-efficient cloud infrastructure
Reduction of business travel through virtual collaboration
Office energy optimisation including LED lighting and reduced footprint
Adoption of digital documentation and workflows
Planned Measures (2025–2030)
Energy and Facilities
Transition to 100% renewable electricity contracts for all offices
Further reduction in physical office footprint
Cloud and Digital Infrastructure
Partner with low-carbon cloud providers committed to Net Zero
Implement workload optimisation to reduce compute usage
Monitor emissions intensity per customer or transaction
Travel and Transport
Introduce a low-carbon travel policy prioritising rail over air
Encourage electric vehicle use through staff incentives
Offset unavoidable business travel (short term measure only)
Supply Chain Engagement
Require key suppliers to:
Measure and report emissions
Commit to Net Zero targets
Introduce sustainability weighting in procurement decisions
Employee Engagement
Carbon awareness training
Incentives for sustainable commuting
Work-from-home support to minimise travel emissions
Residual Emissions and Offsetting
Once maximum feasible reductions are achieved, CareMonitor will neutralise remaining emissions using high-quality verified offsets, prioritising:
Nature-based solutions such as reforestation
Carbon removal initiatives over avoidance where available
Accepted standards include:
Gold Standard
Verified Carbon Standard (VCS)
Governance and Accountability
Oversight by Executive Leadership Team
A designated Sustainability Lead responsible for delivery
Quarterly internal tracking of emissions performance
Annual review of targets and progress
Reporting and Transparency
CareMonitor commits to:
Publishing this Carbon Reduction Plan annually
Maintaining data aligned with:
GHG Protocol Corporate Standard
UK Government emissions factors
Supporting customer and public sector reporting requirements
Declaration and Sign-Off
This Carbon Reduction Plan has been prepared in accordance with PPN 06/21 and associated guidance.
Emissions have been reported and recorded in line with:
GHG Reporting Protocol Corporate Standard
UK Government environmental reporting guidelines
Signed on behalf of CareMonitor:
Name: Deepak Biswal
Position: Chief Executive Officer
Date: 1 July 2026